Every Sunward project follows the same orderly path, so you know what happens at each stage, from the first site visit through commissioning and utility approval.
How it works
Five clear stages
01
Site assessment
We inspect the roof or site and evaluate the structure and electrical load before any design begins.
02
System design
Our engineers prepare the layout, equipment specification, and electrical schematics for your property.
03
Permitting
We handle permit applications and coordinate local municipal and utility approvals on your behalf.
04
Installation
Our crews mount the panels and wiring methodically, following the approved design and safety standards.
Our standards
Sunward coordinates code compliance and utility interconnection throughout the project, so each system is installed to strict standards before it goes live.— Sunward installation team